Abstract
Productivity is one aspect that determines the success of a company in the competitive world of business. There are seven main types of activities that do not have value-added in manufacturing processes such as overproduction, waiting time, transportation, excess inventory, unnecessary motion and defects. The whole activity is a waste (waste) that can cause harm to the Company. Therefore, in production activities is important to pay attention so that the objectives of production productivity can be achieved. Problems experienced by CV Piranti Works is a production target is not achieved resulting in a lost sale raises the cost of which can cause harm to the Company. From the analysis conducted major known cause of the problem is the length of time required for changeover. This is supported by the high non-value added activity in the changeover activities. Lean Manufacturing is an approach to make system more efficient by reducing waste. This study refers to the book compiled by Takashi Osada (2004) and several other references. In this research used method 5S (Seiri, Seiton, Seiso, Seiketsu, and Shitsuke) for the of forming departement. The purpose of this research is to design a work environment using the 5S method (Seiri, Seiton, Seiso, Seiketsu, and Shitsuke) and make arrangement of equipment and working tool cabinet design with TRIZ methods. From these results, is expected to eliminate or reduce of non-value added activity and improved the changeover time so as to meet production targets completion of the company.