Abstract
The Production and Supply Optimization in PT. Goodyear Indonesia Tbk and its study in this paper provide the purposes to create a model of the Master Production Schedule (MPS). The mentioned MPS complies with company policy, production capacity and supply received. From view point of Industrial Engineering, there are needs for forecasting method effectiveness toward the company production capacity. Furthermore, from view point of Information Systems, there are needs to provide the MPS as compare to prior systems that was done manually resulting in the frequent error at the time of making MPS deductible. Several Methods are used and considered, such as: The method of time series, Mean Square Error (MSE), Mean Absolute Percentage Error (MAPE), the calculation of production capacity, MPS, and designing information systems. By having the combination of views from Industrial Engineering and Information Systems perspective the improvement can be conducted from both theoretical development and its managerial implications.