Sign in
A reliable methodology based on mine blast optimization algorithm for optimal sizing of hybrid PV-wind-FC system for remote area in Egypt
Journal article   Peer reviewed

A reliable methodology based on mine blast optimization algorithm for optimal sizing of hybrid PV-wind-FC system for remote area in Egypt

Ahmed Fathy
Renewable energy, Vol.95, pp.367-380
01/09/2016

Abstract

Fuel cell Mine blast algorithm PV/WT/FC system Wind turbine

Metrics

1 Record Views

Details