Abstract
In this paper, an attempt is made to develop a new variable control chart under the resubmitted sampling scheme. The resubmission of a sample allows retaking a sample to pass through inspection/analyzing if there is a question on the inspection of the sample at any stage. The proposed control chart includes the X-bar chart as a special case. The performance of the proposed control chart is assessed by determining the in-control and out-of-control average run lengths for the various parametric settings. For illustrative purposes, a real-life example is presented to explain a detailed implementation of the proposed control chart.