Sign in
Optimal Solution to the Two-Stage Hybrid Flow Shop Scheduling Problem with Removal and Transportation Times
Journal article   Open access  Peer reviewed

Optimal Solution to the Two-Stage Hybrid Flow Shop Scheduling Problem with Removal and Transportation Times

Lotfi Hidri and Ahmed M. Elsherbeeny
Symmetry (Basel), Vol.14(7), p.1424
01/07/2022

Abstract

Multidisciplinary Sciences Science & Technology Science & Technology - Other Topics
url
https://doi.org/10.3390/sym14071424View
Published (Version of record) Open

Metrics

1 Record Views

Details