Abstract
A reliability model for phased mission systems is developed. First, the mission phase change times are assumed to be known in advance. Next, these times are assumed as random variables and a method of solution is presented. The solution procedure is illustrated by an illustrative example. It is seen that for large systems, an analytical expression for mission system reliability becomes quite involved and requires a computation procedure.