Sign in
Total float management: computerized technique for construction delay analysis
Journal article   Peer reviewed

Total float management: computerized technique for construction delay analysis

Khalid S Al-Gahtani, Ibrahim A Al-Sulaihi and Asif Iqupal
Canadian journal of civil engineering, Vol.43(5), pp.391-401
01/05/2016

Abstract

analysis software claim construction delay logiciel d’analyse retard réclamation schedule technique échéancier

Metrics

1 Record Views

Details